Canal operationsCorrection
Panama Canal: dated erratum
Matthew Daley · Published
Evidence correction · Applies to the 16 November frozen evidence and its web summary · Not peer reviewed
This correction accompanies the frozen findings PDF and research workbook dated 16 November 2026. The original evidence files remain unchanged. The historical working files are preserved separately and are not offered as site downloads. The web summary has been corrected. No chart values or numerical findings have changed.
2022 maintenance context
The PDF’s “September operating context” table and the workbook Coverage entry describe “short maintenance outages.” That summary is incomplete. ACP’s August 2022 operations summary, p. 2 records the completed Gatun west-lane dry-chamber outage from 30 August to 7 September (nine days), estimated Panamax capacity of 21–23 vessels per day and booking condition 2. There were also shorter outages. The 50 ft draft limit does not make September 2022 an unconstrained operational comparator. The monthly data do not establish how much the outage contributed to CWT.
Time definition
CWT is the elapsed time from when a vessel is declared ready for transit until completion of its transit, according to the ACP 2019 annual report, printed p. 30 / PDF p. 32. The web summary previously said “declares itself ready.” The passive wording avoids an unsupported claim about who makes the declaration. CWT is not simply time since arrival or measured involuntary waiting.
Draft and booking chronology
The web summary previously said the draft reduction “began on 2 September.” Earlier steps had already been announced: 49.5 ft effective 3 July, then 49 ft on 24 July and 48.5 ft on 15 August. The 48 ft limit was effective 2 September; reserved-slot availability became 34 for booking dates from 4 September and 32 from 15 September. Booking sales effective dates differ from the booking dates these allocations cover. These rules are not an independent observation of vessel compliance. They do not identify separate causal effects on monthly traffic or CWT.
Interpretation and original files
High CWT alone does not identify a water constraint. Nor does the comparison prove that water had no effect in 2026. Maintenance, vessel mix and other differences remain competing explanations. This erratum supplies context rather than a causal estimate.
The original working files are preserved unchanged. This dated correction and the revised article are the reader-facing record.
How to cite
Daley, Matthew. (2026, November 17). Panama Canal: dated erratum. CEVE Research.