Port operationsResearch note
What port queue counts can miss
Matthew Daley · Published
Research note · Not peer reviewed
The Panama Canal’s published queue and nearby radar targets raise the same question as this Los Angeles and Long Beach case: which ships does a queue count include? The line of ships near Los Angeles and Long Beach thinned before the full backlog cleared. Even after it cleared, berth stays at Los Angeles were still longer than before the pandemic.
The queue moved before it cleared
In November 2021, the ports changed how ships secured a place in the labor queue. A calculated arrival time assigned after departure from the previous port let ships slow down or wait farther away without losing their place. On January 9, 2022, the reported backlog was 109 container ships. Only 12 were at anchor or loitering within 40 miles. The other 97 were reported in the wider queue category, which followed calculated arrival times rather than a ship-by-ship position count. The original list edition and exact cutoff for January 9 have not been confirmed.
Original queue notice · Harbor Commission staff report · Marine Exchange’s January 12 reporting method
Berth stays after the backlog cleared
The Marine Exchange dated the end of the regional backlog to November 22, 2022. At Los Angeles, reported berth stays for departing container ships averaged:
- Weeks 1–4 (Nov. 23–Dec. 20): 3.7 days across 63 departures, versus 3.3 days across 54 in the matched 2019 weeks.
- Weeks 5–8 (Dec. 21–Jan. 17): 4.2 days across 57 departures, versus 3.3 days across 48 in the matched 2019–20 weeks.
Six of the eight weeks were higher, one was about level (week 5), and one was lower (week 2).
How we checked. We matched weeks by Thanksgiving and weighted the Port’s published daily averages by reported departures. The tables omit weekends and holidays. We treated the row printed December 12, 2012 as December 12, 2022 based on its position in the table. These figures cover time alongside at Los Angeles only, not loading time. They do not adjust for ship or terminal mix or establish a recovery date.
As at the Panama Canal, report the count and a time measure together, and say what each covers.